THE FIVE PHASES OF YOUR PROJECT
PHASE 1
PLANNING & CONCEPTUAL DEVELOPMENT
Coordination of Conceptual Design Requirements
Assist in Site Selection
Project Criteria Document Development
Assist with Architect and Engineers Selection
Assist with Survey and Soils Testing Agency Selection
Conceptual Budgeting and Scheduling
Budget Analysis
Property Due Diligence
Secure Entitlements
Jurisdictional Authority Interface
PHASE 2
DESIGN & PROJECT-SPECIFIC MANAGEMENT SYSTEMS ASSEMBLY
Assist with Conceptual Design Development
Determine Project Delivery Method
Design Analysis and Coordination
Planning Construction Methods
Development of Budgetary Estimates
Value Engineering Design Analysis
Scheduling and CPM Development
Development of Cash Flow Forecasts
Development of Project and Procedural Control Systems
Evaluation of Construction Techniques and Materials Analysis
Drawing and Specification Reviews
General Conditions Review and Development
Preparation and Assembly of Contract Documents
Bid Package Assembly
Architect/Engineer Program Coordination
PHASE 3
BIDDING AND CONTRACT ADMINISTRATION
Qualified Bidder List Development
Pre-bid Conference
Bid Package Broadcast
Bid Evaluations
Contract Award Recommendations
Contract Negotiations
Contract Document Development
Contract Administration
Establishment of Financial Control Systems for Contractor Payment
Status Reporting
Permitting
Jurisdictional Coordination
PHASE 4
CONSTRUCTION
Conduct Pre-construction Conference
Management of the Construction Effort - Cost, Time, Scope & Quality Control
Detailed Project Cost Budget Control
Implementation of Financial Control Systems
Billing Voucher Control
Project Status Reporting
Detailed CPM Scheduling
Submittal Review Support & Tracking
Define and Coordinate Procurement of Long Lead Delivery Materials and Equipment
Control and Process of Change Orders
Generate Cost Reports
Continuous Contractor Performance Evaluation
Prepare Project Completion Documents, Including Cost Summary and Reconciliation
Deficiency and Punch List Management
Assist with final inspections and Notice of Substantial Completion
Collect Contractor Closeout Documents
Obtain Final Owner/User Acceptance
PHASE 5
POST-CONSTRUCTION, OCCUPANCY, OPERATION & MAINTENANCE
Record Notice of Completion
Post-Construction Follow-up
Plan Move-in to Minimize Down-time
Move-in Coordination
Operation and Maintenance Data Compilation
Coordinate System and Equipment Operational Training for Staff
Development of Preventative Maintenance Scheduling Program
Facility Problem Analysis and Consultation
Claims Mitigation